The Construction Process

Step 1: Planning & Design

The process begins with our engineering team creating a detailed plan to bring Wisper Fiber to your area as efficiently as possible. You might see our crews in your neighborhood collecting information to guide this plan. Our team determines the best way to install the Fiber – whether underground, on existing utility poles, or a combination of both. We also coordinate closely with local authorities to secure all necessary approvals and permits for the project.

Step 2: Identifying Utilities

Public Utilities: Once our construction plans are approved, public utility companies are notified to come mark the locations of water, gas, and electrical lines using small flags or temporary spray paint. Please don’t move or remove these markers—we’ll handle cleanup once construction is finished. The paint used is water-based and will naturally fade with time. Tampering with the markers will require the utility companies to re-do the work, resulting in a delay of Fiber construction.

Private Utilities: If you have private utilities such as sprinklers, an electric pet fence, or a septic system, please mark them ahead of construction to avoid any issues. Utility companies do not mark private utilities. If you notice any issues or have concerns, please reach out to us at 800-765-7772.

Step 3: Construction

Now it’s time to build our Fiber network! Based on the custom plan for your area, our crews may use specialized equipment to place Fiber along the public rights-of-way:

  • Aerial – on existing utility poles. For everyone’s safety, tree trimming may be required. If we need to access poles in an easement behind your property, we’ll let you know if we anticipate any issues with alleyways, driveways, or other obstacles. A majority of our Fiber builds will be aerial.

  • Underground – trenching cables beneath the surface. This may be done along the rights-of-way or on easements that may be on your property (for example, a backyard easement). Don’t worry, we’ve already worked with your town to secure the proper approvals during the planning phase.

  • Both – a combination of aerial and underground methods.

Not sure what a right of way is? Read about it here.

Once installation is complete, our professional team will splice and test the Fiber to ensure you have a lightning-fast, reliable connection.

Step 4: Cleanup

We know construction can sometimes be disruptive, but our crews take great care to protect your property and will clean up once the work is complete. If you have any concerns during or after construction, please give us a call and we’ll be happy to assist.

Current Fiber Projects

Waynesville, MO

Construction is expected to start in December for Waynesville. 

St. Robert, MO

Construction is expected to start in December for St. Robert. 

Richland, MO

Construction started in late November for Richland. 

Greenville, IL

Construction is started in December for Greenville. 

Cook Station, MO

Construction started in December for Cook Station. 

Brumley, MO

Construction is expected to start in December for Brumley. 

Get Notified When Fiber is Ready for You!

If your area is listed above as a construction site and you would like to be notified when Fiber is ready to be installed at your home, please complete the form below. 

Name(Required)
Address(Required)
Email(Required)

Got Questions? We're Here to Help!

Contact our team through your preferred method below, and we’ll answer any questions you may have about the Fiber construction happening in your area. 

Email

support@wisperisp.com

Phone

800-765-7772

Chat

Start a chat in the bottom right corner of this page